Detroit is about to take down two towers of the building that was supposed to save it. The Renaissance Center opened in 1977 as a fortress against a city everyone had given up on, and the design decisions that followed from that premise, the blank concrete podium and the disorienting internal circulation, are exactly what the $1.6 billion redevelopment is now unwinding.
Project Scope
Bedrock and General Motors would demolish the podium along with Tower 300 and Tower 400, the two nearest the river, and rework the remaining structures into a mixed-use district across roughly 27 riverfront acres. The 73-story central tower’s 1,300-room Marriott shrinks to 858 hotel rooms and picks up 200 apartments. Gensler is credited on the renderings Bedrock has released. Funding runs to about $1 billion from Bedrock and $250 million from GM, with the balance from Michigan’s Transformational Brownfield programme. Demolition could begin by summer 2027, subject to public meetings, Detroit’s Community Benefits process and brownfield approvals.
Why It Matters
The Michigan House voted on July 3, 2026 to raise the Transformational Brownfield cap to $3.2 billion, which cleared the project’s largest financial obstacle. That vote is the reason this is a live project rather than a proposal.
The scope is unusual in a way worth stating plainly. Selective demolition of two 39-story towers and a multi-level podium, on a river’s edge, inside a complex that stays partially occupied, is a very different job from imploding a stadium. Every structural tie between the towers and the retained buildings has to be understood before anything comes down. GM has put more than $1 billion into the site since buying it in 1996 and has already moved its headquarters to Hudson’s Detroit, so the company is paying to unwind a building it spent three decades trying to make work.
Related coverage & projects
Project Team & Details
| Developer | Bedrock |
|---|
| Owner / Client | General Motors / Bedrock |
|---|
| Architect | Gensler |
|---|
| Status | Planned |
|---|
| Funding Source | Mixed |
|---|