Electrical Companies in Washington

The top electrical, communications, fire alarm, and security related companies in Washington

Short answer: Exchange lists 8 electrical contractors in Washington. The Department of Labor and Industries licenses electrical contractors under chapter 19.28 RCW. Each company needs a $4,000 bond and a designated master electrician or certified electrical administrator, and everyone doing the work must hold an electrician or trainee certificate. Washington enforces the 2023 NEC, and the 2026 NEC takes effect December 31, 2026. Liens must be recorded within 90 days of the last day of work.

Regulator
The Washington Department of Labor and Industries (L&I) licenses electrical contractors and certifies electricians under chapter 19.28 RCW.
Contractor license
A Washington electrical contractor license requires a $4,000 bond or savings assignment and a designated master electrician or certified administrator, and it lasts 24 months.
Journey level hours
A journey level electrician certificate requires 8,000 hours, including 4,000 hours of new industrial or commercial installation, under RCW 19.28.191.
Code edition
WAC 296-46B-010 adopts the 2023 NEC, and the 2026 NEC replaces it effective December 31, 2026.
Inspection jurisdiction
L&I issues electrical permits statewide except in 25 cities, including Seattle, Spokane, Bellevue and Vancouver, and in Tacoma Power's service area.
Lien deadline
A Washington claim of lien must be recorded within 90 days after the claimant stops furnishing labor or materials, and foreclosure must follow within eight months.

Who licenses electrical contractors in Washington?

In Washington, the Department of Labor and Industries licenses electrical contractors and certifies the electricians who work for them, under chapter 19.28 RCW and the electrical rules in chapter 296-46B WAC.

Washington regulates the business and the worker separately. The business needs an electrical contractor license, either general or limited to a specialty. RCW 19.28.041 requires a $4,000 bond naming the state as obligee, or a cash deposit or other security L&I accepts, and the bond must stay in force or the license is suspended. The applicant must designate one person who holds a master journey level electrician certificate, a master specialty electrician certificate in the specialty applied for, or a general or specialty electrical administrator certificate. L&I's contractor page also requires a UBI business number. The license expires 24 calendar months after it is issued.

Liability insurance is not required for an electrical contractor license, but L&I encourages contractors to carry it and keeps no record of it. Telecommunications contractors are licensed under the same chapter but are treated differently: they need a designated telecommunications administrator and at least $170,000 of general liability coverage. A company that holds several specialty licenses posts only one bond. Owners should therefore ask for a certificate of insurance separately, because a valid Washington electrical license does not prove the company carries any. Applicants should also allow extra time: L&I's licensing page reports a significant backlog in affidavit processing, with affidavits date-stamped on receipt and handled in the order received.

What certificates do Washington electricians need?

Under Washington law, anyone doing electrical construction work needs a valid L&I certificate: master journey level, journey level, master specialty, specialty or electrical trainee, under RCW 19.28.161.

RCW 19.28.191 sets the journey level route at an 8,000-hour approved apprenticeship, with 4,000 of those hours on new industrial or commercial installations. Out-of-state applicants qualify with an equivalent 8,000-hour apprenticeship, a journey certificate from a state that required at least 8,000 supervised hours, or 16,000 hours of out-of-state experience. Specialty certificates for residential, pump and irrigation, sign, limited energy and nonresidential maintenance work require at least 4,000 supervised hours in the specialty. A master journey level certificate requires holding a journey level certificate for four years; a master specialty certificate requires two years in the specialty.

Trainees hold an electrical training certificate, renew it every two years, and must show 48 hours of approved classroom training at renewal. Supervision is tight. A certified electrician must be on the same jobsite at least 75 percent of each working day, and 100 percent when one electrician supervises three or four trainees. On journey level work, no more than one noncertified person may work per certified electrician, and on specialty work no more than two. Certified electricians renew with eight hours of approved continuing education per year of the certification period, including at least eight hours on code changes and four hours on chapter 19.28 RCW.

Which licenses, permits and registrations apply in Washington?

RequirementWho issues itWhen it appliesWhat it involves
Electrical contractor license (general or specialty)Washington Department of Labor and IndustriesAny business offering electrical work for others$4,000 bond or savings assignment, UBI number, designated master electrician or administrator; 24-month term
Electrical administrator certificateWashington Department of Labor and IndustriesPerson designated to oversee a contractor's code compliancePass L&I qualifying exam; does not permit installing without an electrician certificate
Journey level or specialty electrician certificateWashington Department of Labor and IndustriesEvery person performing electrical installation work8,000 hours (4,000 commercial or industrial) for journey level; 4,000 hours for most specialties; exam
Electrical training certificateWashington Department of Labor and IndustriesApprentices and trainees learning the tradeRenew every two years with 48 classroom hours; supervision 75 to 100 percent of each day
Electrical work permit and inspectionL&I, or one of 25 cities or Tacoma Power within their limitsMost installations except class A basic electrical workWiring not covered until approved; inspection required before utility connection
Notice of right to claim a lienSent by the claimant under RCW 60.04.031Suppliers and lower-tier claimants without a direct contract with the ownerCovers supplies from 60 days before notice, 10 days for new single-family homes

How do I check an electrical contractor in Washington before I sign?

7 checks, in order, using the Washington registers and rules described on this page:

  1. Search the company on the L&I Verify a Contractor, Tradesperson or Business tool and confirm an active electrical contractor license, the $4,000 bond and an active workers' comp account.
  2. Check the license type: a general electrical contractor can do any electrical work, while a specialty license such as limited energy only covers that specialty's scope.
  3. Ask the crew to show their L&I electrician or trainee certificates; trainees must have a certified electrician on site at least 75 percent of each working day.
  4. Find out whether L&I or your city issues the permit; Seattle, Spokane, Bellevue, Vancouver and 21 other cities run their own electrical permits, as does Tacoma Power in its area.
  5. Put in the contract that the electrician buys the permit and that no wiring is covered until inspected under RCW 19.28.101.
  6. For work permitted on or after December 31, 2026, confirm the design follows the 2026 NEC adopted in WAC 296-46B-010.
  7. On an owner-occupied remodel, collect notices of right to claim a lien from suppliers and lower-tier subs and get lien releases before final payment, because RCW 60.04.031 limits their liens to unpaid contract funds.

What is an electrical administrator in Washington?

In Washington, an electrical administrator is a person who has passed an L&I qualifying exam and is responsible for making sure a contractor's work complies with electrical laws and rules.

An administrator certificate does not, by itself, allow the holder to install wiring. L&I says administrators are not certified to install unless they also hold an electrician or trainee certificate. The administrator path suits owners, estimators and project managers who run an electrical company without working in the field, while a master electrician can serve as the designated administrator and also install and supervise trainees. Because the license depends on that designated person, a Washington electrical contractor that loses its administrator or master electrician must replace that person to keep the license.

General electrical administrators may oversee any electrical work, while specialty administrators are limited to the matching specialty, such as limited energy systems or pump and irrigation. When reviewing a bid, owners should check that the contractor's license specialty matches the scope. A limited energy specialty contractor, for example, may install low-voltage controls and data cabling but not a service upgrade or new branch circuits. The L&I Verify tool shows the license type, the designated administrator or master electrician, the bond and any lawsuits against the bond, so a mismatch between scope and specialty is easy to spot before the contract is signed.

Which electrical code and permits apply in Washington?

Washington enforces the 2023 National Electrical Code with state amendments, effective April 1, 2024, and the 2026 NEC takes effect December 31, 2026 under WAC 296-46B-010.

L&I adopted the 2026 NEC in rulemaking filed November 18, 2025 (WSR 25-23-069). WAC 296-46B-010 now states that, effective December 31, 2026, the 2026 edition of NFPA 70 replaces the 2023 edition. Jobs permitted after that date should be designed to the 2026 NEC and the Washington amendments in chapter 296-46B WAC, so contractors bidding winter 2026 work should confirm which edition the permit date triggers. The same WAC section also adopts by reference the latest ANSI/TIA commercial and residential telecommunications cabling, pathway and bonding standards and the National Electrical Safety Code, so telecommunications and utility-adjacent work in Washington follows those documents alongside the NEC.

RCW 19.28.101 requires an electrical work permit for installations, with narrow exceptions for class A basic electrical work, while class B basic work is inspected on a random basis. L&I issues permits and inspects in most of the state, but 25 cities run their own programs, including Seattle, Spokane, Bellevue, Everett, Vancouver, Olympia, Redmond and Renton, and Tacoma Power issues electrical permits in its service area. City standards must meet or exceed L&I's. Wiring may not be covered until it is inspected and approved. Under RCW 19.28.101, inspections are to occur within 48 hours of a request, excluding weekends and holidays, and work must be inspected before the utility connects power. Installations found unsafe must be corrected within 15 days unless a longer period is granted.

What are the lien deadlines for electrical contractors in Washington?

In Washington, a construction lien must be recorded in the county where the property is located within 90 days after the claimant stops furnishing labor or materials, under RCW 60.04.091.

RCW 60.04.141 then gives the claimant eight calendar months after recording to file a foreclosure action in superior court in that county, with service on the owner within 90 days of filing. If credit terms are stated in the lien, the eight months run from when the credit expires. Missing either deadline ends the lien. The lien can cover labor, professional services, materials and equipment furnished for the improvement, and the claim is recorded with the county recorder rather than filed in court, so an electrical contractor working in several counties must record each claim in the county where that property sits and track a separate 90-day clock for each job.

Pre-lien notice rules under RCW 60.04.031 matter for electrical subcontractors and suppliers. Anyone who supplies materials, equipment or professional services and does not contract directly with the owner must give the owner a written notice of the right to claim a lien. The notice protects only what was supplied in the 60 days before it was delivered, or 10 days before it for new single-family construction. Subcontractors who contract directly with the prime contractor and laborers claiming only for labor are generally exempt. On owner-occupied residential repair and remodel jobs, the rules are stricter. A sub or supplier without a direct contract with the homeowner must give notice, and its lien can only be paid from money the owner had not yet paid the prime contractor when the notice arrived. Electrical subcontractors on home remodels should send that notice early.

How are data centers and clean energy policy driving electrical work in Washington?

In Washington, electrical demand is being shaped by data center growth and by the Clean Energy Transformation Act, which requires utilities to supply 100 percent clean electricity to retail customers by January 1, 2045.

Under RCW 19.405.040, retail electricity sales in Washington must be greenhouse gas neutral by January 1, 2030, and RCW 19.405.050 requires 100 percent of retail sales to come from renewable and nonemitting resources by January 1, 2045. Those targets drive utility-scale solar, wind, battery storage and transmission work, as well as building electrification. An earlier CETA deadline under RCW 19.405.030 required each electric utility to remove coal-fired resources from its allocation of electricity on or before December 31, 2025, so replacement generation and storage are already under construction. That work needs contractors licensed for medium-voltage and utility-interconnected systems and journey level electricians with commercial and industrial hours.

Data centers add to that demand. On February 4, 2025, Governor Bob Ferguson signed Executive Order 25-05, which directed the Department of Revenue to lead a data center workgroup with Commerce, the Utilities and Transportation Commission, Ecology, utilities, labor and industry. The workgroup was to report on data centers' effects on energy use, the grid, tax revenue and jobs by December 1, 2025. For electrical contractors, new data halls and the substations that serve them are large general electrical contractor projects. They require 8,000-hour journey level crews with strict trainee ratios, plus limited energy specialty contractors for fire alarm, security and structured cabling.

How does the Washington State Energy Code affect electrical work?

The 2021 Washington State Energy Code, in effect since March 15, 2024, sets lighting, controls and electrification requirements that Washington electrical contractors install and inspectors check; the 2024 edition is due to take effect May 3, 2027.

The State Building Code Council publishes the commercial energy code as chapter 51-11C WAC and the residential code as chapter 51-11R WAC. For electrical contractors, its lighting power limits, automatic lighting controls, metering and electrification provisions determine fixture selection, control wiring and panel capacity, and the commercial code's commissioning requirements bring the electrical contractor into functional testing near the end of the job. Energy code compliance is reviewed by the local building department, separately from the L&I or city electrical inspection, so electrical contractors on commercial projects often coordinate with two review agencies on the same lighting and controls package.

The next edition is moving through rulemaking now. The Council's adoption schedule shows public comment on the 2024 commercial and residential energy codes running from July 1 to August 7, 2026, with final adoption targeted for November 20, 2026. The Council has announced that the 2024 codes will take effect May 3, 2027. Projects that vest under the 2024 codes after that date may need different lighting, controls and electrification designs, so contractors pricing 2027 work should check the permit application date against the effective date and carry any lighting or controls changes into their bids.

How can Washington owners check an electrician before hiring?

Washington owners can check an electrical contractor's license, bond, designated administrator, workers' compensation account and any bond lawsuits using the L&I Verify a Contractor, Tradesperson or Business tool before signing.

The Verify tool searches by business name, license number, UBI number or workers' comp account, and it also shows safety violations, and the page links to L&I's list of debarred contractors and prevailing wage forms, which matter on public works. Owners should confirm the license is an electrical contractor license rather than a general contractor registration, because general contractors registered under chapter 18.27 RCW cannot do electrical work without an electrical license. Also confirm that the workers who show up hold their own electrician or trainee certificates, which they must carry while working.

RCW 19.28.261 lets property owners do electrical work on their own residence, farm, business or other property without a license. The exemption does not apply to a new building intended for rent, sale or lease, or to property offered for sale within 12 months of being acquired. A householder may get help from a friend, neighbor or relative, provided none of them hold themselves out as being in the electrical business. An owner of a new building with up to four units may claim the exemption by affidavit if they will live in one unit for 24 months, and only once every 24 months. Owner-performed work still needs a permit and inspection from L&I or the city that has jurisdiction.

Where can I verify a license and check the source in Washington?

Every figure and rule on this page can be checked against the primary source. These are the offices that publish them. Confirm current requirements directly before you rely on any of them:

Electrical Contractor, Washington State Department of Labor and Industries; RCW 19.28.191 Certificates of competency, Washington State Legislature; WAC 296-46B-010 General, Washington State Legislature; City Electrical Permits and Inspections, Washington State Department of Labor and Industries; RCW 60.04.091 Recording of lien, Washington State Legislature; Energy Code, Washington State Building Code Council.

Electrical contractors in other regions: Alberta, British Columbia, California, Colorado, Florida, New South Wales, North Carolina, Ontario, Queensland, Texas.

Other trades in Washington: Envelope, General Contracting, HVAC, Mechanical, Renovation & Remodeling, Restoration, Roofing & Waterproofing.

Jump to licence verification sources for Electrical in Washington, or back to all electrical contractors on Exchange.

Frequently asked questions

Does a Washington general contractor registration cover electrical work?

No. Contractor registration under chapter 18.27 RCW does not authorize electrical work. Electrical installations for others must be done by a business holding an L&I electrical contractor license under chapter 19.28 RCW and performed by certified electricians or supervised trainees. A general contractor must subcontract the electrical scope to a licensed electrical contractor.

How long does it take to become a journey level electrician in Washington?

The standard route is an approved 8,000-hour apprenticeship, roughly four years of full-time work, with at least 4,000 hours on new industrial or commercial installations, followed by the L&I exam. A two-year electrical program at a technical school can replace up to two years of work experience, though two more years of commercial or industrial installation work are still required.

When does Washington switch to the 2026 NEC?

WAC 296-46B-010 states that the 2026 edition of NFPA 70 is adopted and replaces the 2023 edition effective December 31, 2026. Until then, the 2023 NEC with Washington amendments, in effect since April 1, 2024, applies to L&I permits. Cities that run their own electrical programs must enforce standards that meet or exceed L&I's.

Can a Washington homeowner do their own electrical work?

Yes. RCW 19.28.261 lets owners work on their own residence, farm or business property without a license. The exemption does not cover a new building for rent, sale or lease, or property offered for sale within 12 months of being acquired. Owners still need a permit and must pass inspection before covering wiring or getting power connected.

Do Washington electrical contractors need liability insurance?

Not for the electrical contractor license. L&I requires a $4,000 bond or savings assignment, not liability insurance, though it encourages contractors to carry coverage. Telecommunications contractors are different and must carry at least $170,000 of general liability insurance. Owners should ask for a certificate of insurance before work starts.

How fast does L&I inspect electrical work in Washington?

RCW 19.28.101 calls for inspections within 48 hours of a request, excluding weekends and holidays. If L&I misses a written request deadline of 24 hours, the utility may connect power immediately if the required permit is displayed. Wiring may not be concealed before approval, and unsafe work must be fixed within 15 days unless more time is granted.

How many trainees can one Washington electrician supervise?

On journey level work, RCW 19.28.161 allows no more than one noncertified person per certified electrician; on specialty work, no more than two, with exceptions for approved college and trade school programs. When ratios of one to three or four trainees apply, the certified electrician must be on site 100 percent of each working day.
Sequoyah Electric logo
New

Sequoyah Electric

Staley Electric — Electrical

Staley Electric

Total Power Energy — Electrical

Total Power Energy

Artisan Electric — Electrical

Artisan Electric

Reliant Electric — Electrical

Reliant Electric

Mr. Electric of Kennewick — Electrical

Mr. Electric of Kennewick

Lander Electric — Electrical

Lander Electric

Kemly Electric — Electrical

Kemly Electric

Kirby Electric — Electrical

Kirby Electric

Loading…