Lima’s current armory was built when the Guard still kept horses. The Ohio Army National Guard broke ground on Nov. 9, 2026, on its replacement, a $32 million readiness center on about 40 acres along Bluelick Road near the Allen Oakwood Correctional Institution.
The building will house Company B of the 837th Engineer Battalion, already based in Lima, and the 1487th Transportation Company, which moves over from Piqua. Federal money covers 75% of the cost and the state pays the other 25%, according to WLIO. Construction is expected to take about two years.
Project Scope
The center runs about 53,160 square feet, with training, administration, communications, logistics, storage and unit operations under one roof. American Structurepoint, the Indianapolis engineering and architecture firm, is prime design consultant and is tying the building into the site work: parking, circulation, drainage, utilities and the antiterrorism/force-protection standoff that every Guard facility now needs. HEAPY of Dayton handled MEP, fire protection and technology design and is providing construction-phase services.
The program goes beyond a drill hall. There’s a backup generator, paved organizational vehicle parking, a detached controlled waste building and a detached flammable materials building. A two-story glass atrium marks the entry, and HEAPY routed systems to stay out of sight there.
Mechanical choices lean practical. Fan coils and boiler coils serve most spaces, the lobby gets radiant slab heat and the dedicated outdoor air system uses energy recovery. The maintenance bay has a dry-pipe sprinkler system fed by nitrogen generators to fight corrosion, plus an oil/water interceptor. The kitchen gets a grease interceptor. EV chargers are going in now, and conduit has been run to a site set aside for a future solar field.
Why It Matters
Readiness centers are where Guard units train on drill weekends and stage when floods or storms hit. A lot of Ohio’s are old. The adjutant general, Maj. Gen. Matthew Woodruff, said the original Lima armory “used to have horse stables,” which says plenty about how far the state’s facilities have drifted from current mission needs.
The design targets a 50-year life and has to meet DoD’s UFC 1-200-02 high-performance building criteria, so this is not a cheap box. The numbers are worth watching, though. Structurepoint lists the project at $26.5 million, and the public bid estimate for the general contract was $27 million before alternates. Local reporting puts the total at $32 million. That gap probably reflects soft costs and alternates, but nobody has published the breakdown.
Related coverage & projects
Project Team & Details
| Owner / Client | Ohio Army National Guard (Ohio Adjutant General's Department) |
|---|
| Architect | American Structurepoint, Inc. (Prime Design Consultant) |
|---|
| Consultants | HEAPY (MEP, Fire Protection and Technology Engineering; Construction Phase Services) |
|---|
| Status | Under Construction |
|---|
| Funding Source | Mixed |
|---|