Woolsey Finnell Bridge Replacement, Tuscaloosa
A construction project located in Tuscaloosa.
A Bit About Woolsey Finnell Bridge Replacement, Tuscaloosa
The Woolsey Finnell Bridge replacement in Tuscaloosa came in well over its last public estimate. The Alabama Department of Transportation awarded Scott Bridge Company a $167 million contract on Oct. 14, 2026, to replace the 1961 crossing that carries McFarland Boulevard (U.S. 82) over the Black Warrior River. Scott Bridge was low of three bidders. As recently as late 2025, local coverage put the job at about $132 million.
Project Scope
The contract covers two bridges, the river crossing and the McFarland bridge over Campus Drive, plus widening of about 1.5 miles of U.S. 82 from near Rice Mine Road to the University Boulevard interchange ramps. The existing four-lane river bridge gives way to a crossing with six through lanes and pedestrian and bicycle accommodations, including a dedicated shared-use path across the river.
That path matters locally. It’s designed to link the Riverwalks on the north and south banks, something the current bridge, with no shoulders, can’t do.
The corridor carries about 50,000 vehicles a day, and the contractor has to keep two lanes open in each direction throughout construction. Work is expected to start in early 2027 and take up to four years.
Some of the prep is already done. ALDOT has finished relocating about 80 graves from Bryce Cemetery along Jack Warner Parkway to clear room for the work.
Why It Matters
The existing bridge was never designed for barge impact loads, a real gap on a navigable waterway with commercial traffic. ALDOT’s own historic review found the 1961 girder bridge significant enough to recommend for National Register eligibility, which tells you how much paperwork a replacement like this takes before anyone pours concrete.
The funding story is the familiar one for Alabama. A $100 million earmark that then-Sen. Richard Shelby put into the 2023 federal omnibus covers most of the job. The bid gap is the catch. A $167 million award against a $100 million earmark leaves a bigger share for other sources than the $132 million estimate did.
For Scott Bridge, the Opelika-based heavy civil contractor, it’s a big in-state win. Keeping four lanes of traffic moving over a river for four years is the part of the job that doesn’t show up in the bid tab.
Project Team & Details
| Owner / Client | Alabama Department of Transportation (ALDOT) |
|---|---|
| General Contractor | Scott Bridge Company |
| Status | Planned |
| Delivery Method | Design-Bid-Build |
| Funding Source | Mixed |
Where to find this project
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.
More images from Woolsey Finnell Bridge Replacement, Tuscaloosa
Project Team & Details
| Owner / Client | Alabama Department of Transportation (ALDOT) |
|---|---|
| General Contractor | Scott Bridge Company |
| Status | Planned |
| Delivery Method | Design-Bid-Build |
| Funding Source | Mixed |