Republic, Mo., just put the largest membrane bioreactor system in the state into service. The southwest Missouri city cut the ribbon on Oct. 29, 2026, on an expansion of its Water Reclamation Facility that raises treatment capacity to 5 million gallons a day, the centerpiece of a $145 million wastewater program delivered by Burns & McDonnell.
It’s also the city’s first project delivered through progressive design-build. That choice turned out to matter, because the early numbers didn’t fit the budget.
Project Scope
The plant work centers on the MBR system, which pairs biological treatment with membrane filtration in place of conventional clarifiers. It’s the first of its kind at this scale in Missouri, according to Burns & McDonnell, and it produces higher-quality effluent on a smaller footprint than a conventional plant expansion would need.
Crews built it while the existing facility kept treating flow. New systems came online through phased commissioning instead of a single cutover.
The wider $145 million program goes beyond the plant fence. It includes peak wet-weather improvements, about 13,000 feet of new gravity sewer serving the Brookline corridor, and upgrades at the McElhaney and Lift Station 4 facilities. The city has worked with Burns & McDonnell since a 2017 water and wastewater master plan, and it paid for the program with direct allocations, state revolving fund loans and revenue bonds.
Why It Matters
When early estimates came in over budget, the team didn’t cut treatment goals. It value-engineered the design to bring the price down while keeping the original process targets, something that’s much harder to do once a design-bid-build job is already on the street. “Working as one team helped us respond to cost pressures,” said Alli White, operations manager at Burns & McDonnell.
Republic is one of the faster-growing suburbs around Springfield, and small and midsize utilities like it are where progressive design-build is spreading fastest. They often don’t have big in-house engineering staffs, and they can’t afford a bid that blows the budget after two years of design. The tradeoff is giving up the hard-bid price. Republic’s result, a plant that’s open and a program that came back inside its means, is the case the delivery model’s backers will point to.
Related coverage & projects
Project Team & Details
| Owner / Client | City of Republic, Missouri |
|---|
| General Contractor | Burns & McDonnell (progressive design-builder) |
|---|
| Status | Completed |
|---|
| Delivery Method | Design-Build |
|---|
| Funding Source | Mixed |
|---|