Gross Reservoir Expansion, Boulder County
A construction project located in Boulder County.

A Bit About Gross Reservoir Expansion, Boulder County
The Gross Reservoir Expansion in Boulder County has produced the tallest dam in Colorado. Crews placed the last layer of roller-compacted concrete at 3 a.m. on June 3, 2026, bringing Gross Dam to 470 feet. One more foot of conventional concrete on the crest gets it to 471.
The original dam, finished in 1954, stood 340 feet. Its designers expected it would be raised someday. That took about 70 years, including a permitting process that began in 2002.
Project Scope
Denver Water owns the dam. A Kiewit-Barnard joint venture is building the raise under a CM/GC contract with design assist, and Barnard’s project page lists Black & Veatch as construction manager. ENR reported in 2021 that Stantec and AECOM led the design team.
The method is a roller-compacted concrete buttress placed against the downstream face of the existing arch dam, from the bottom up. Denver Water counts 118 concrete steps up the new face. The raise adds 131 feet and stretches the crest to about 2,000 feet. Before any of that, crews had to cut and roughen the old concrete. Barnard lists 230,000 square feet of hydrodemolition and 23,000 square feet of wire sawing.
The quantities are large for a mountain site with limited access. International Water Power put the total at more than 744,000 cubic yards of RCC and 59,000 cubic yards of conventional facing concrete as of June. Aggregate was quarried, crushed and batched on site, about 2 million tons of it by Barnard’s count. Under a 2021 agreement with Boulder County, the job runs on electric power instead of diesel generators, with limits on truck traffic.
Storage rises from about 42,000 acre-feet to about 119,000, nearly triple.
Why It Matters
RCC placement began in spring 2024 after two years of excavation and foundation work, and it wrapped in a little over two years. That’s quick for a structure Barnard calls the tallest RCC dam in the United States.
The budget moved more than the schedule did. ENR carried a $464 million project cost in November 2021. A month later Denver Water’s board approved a $531 million construction contract, and amendments in 2023 and 2026 took the total to just under $602 million. The utility cites inflation and other cost factors.
The legal cloud has lifted, too. On Sept. 15, 2026, the 10th Circuit Court of Appeals held that the Army Corps of Engineers permit for the expansion was lawfully issued, ending the permit litigation.
What’s left is the finish work: the crest slab, safety walls, the spillway crest with a bridge across its 160-foot gap, the stilling basin, and underwater work on the upstream face. Denver Water now says dam work wraps up in summer 2027, followed by reservoir site preparation through 2028. Filling the new storage could start as soon as 2028, depending on snowpack.
The utility serves about 1.5 million people, and it has been working toward this storage since 2002. Now it needs snow.
Project Team & Details
| Owner / Client | Denver Water |
|---|---|
| Consultants | Stantec (Design Engineer) AECOM (Design Engineer) Black & Veatch (Construction Manager) |
| General Contractor | Kiewit-Barnard Joint Venture |
| Status | Under Construction |
| Delivery Method | CMAR |
| Funding Source | Public (Municipal) |
Where to find this project
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.
More images from Gross Reservoir Expansion, Boulder County
Project Team & Details
| Owner / Client | Denver Water |
|---|---|
| Consultants | Stantec (Design Engineer) AECOM (Design Engineer) Black & Veatch (Construction Manager) |
| General Contractor | Kiewit-Barnard Joint Venture |
| Status | Under Construction |
| Delivery Method | CMAR |
| Funding Source | Public (Municipal) |