The Fort Hill Bridge carries more traffic than any other bridge in West Virginia, and it’s now a work zone. The Interstate 64 crossing of the Kanawha River in Charleston handles about 100,000 vehicles a day, and the $74.5 million rehabilitation contract the West Virginia Department of Transportation awarded to Triton Construction moved into construction in early November 2026, with local first responders already adjusting routes around it.
Officially it’s the Eugene A. Carter Memorial Bridge, a 1975 steel truss arch. WVDOT announced the award on June 30, 2026.
Project Scope
This isn’t a patch-and-overlay job. Triton will replace the full deck and barrier walls on the main structure and on four access ramps, repair structural steel in the arch, and repair and repaint the concrete piers. Earlier rounds of work on the bridge were a membrane and overlay, the kind of fix that buys a decade. This one is aimed at the structure itself.
The phasing is built around keeping I-64 open. Preliminary work, including median crossovers, started this fall on off-peak and overnight shifts, scheduled to stay out of the way of holiday shopping traffic. Single-lane closures, mostly at night and on weekends, come first. WVDOT says the major traffic pattern changes won’t start until early 2027, which is when crews can begin swapping traffic to one side and taking the deck apart in sections.
WVDOT called the award an innovative contract but hasn’t said publicly what’s different about it, whether that’s incentives, lane-rental terms or something else. A completion date hasn’t been published either.
Why It Matters
Charleston doesn’t have an easy detour. I-64 and I-77 share the corridor through downtown, and the river crossings are few. That’s why the crossover-first approach matters: the contractor has to tear out a deck under live interstate traffic for what will likely be more than one construction season.
It’s also a sign of where state bridge money is going. Deck replacements on 1970s steel structures are the backlog across Appalachia, and the costs show it. At roughly $75 million, this job is about what a new mid-size river bridge cost a decade ago. Triton, a West Virginia firm, takes on one of the most visible contracts in the state.
Related coverage & projects
Project Team & Details
| Owner / Client | West Virginia Department of Transportation |
|---|
| General Contractor | Triton Construction Inc. |
|---|
| Status | Under Construction |
|---|