North End Recirculation System, Central Park, New York, New York
A construction project located in New York.

A Bit About North End Recirculation System, Central Park, New York, New York
Central Park has been topping up its northern lakes with city drinking water for decades. That’s ending. The Central Park Conservancy is now building the $35.7 million North End Recirculation System, a pumping and filtration loop that ties the Pool, the Loch and Harlem Meer together and turns the north end of the park into a stormwater sponge. The Conservancy and the New York City Department of Environmental Protection announced the work on Oct. 26, 2026, ENR reported, and the Conservancy’s project page says construction began in September.
The Conservancy is running the job with DEP and NYC Parks, and it’s scheduled to finish in fall 2028.
Project Scope
In dry weather, pumps will send water from Harlem Meer south toward the Pool, where it’s filtered and then flows by gravity down through the Loch and back to the Meer. Filtration equipment goes into below-grade vaults near the Pool and at the south end of the Meer, and an outlet-control structure and a pumped wet well sit near East Drive at the park’s northern end. Recirculation piping runs about 5 feet down across the North Meadow, while the filtration vault and wet well at the Meer reach about 15 feet below grade.
Crews will dredge accumulated sediment from the Meer to restore its original depth. Ahead of big storms, operators can draw the Meer down so it absorbs runoff from 204 acres of the park. A new drain connects the Pool to the sewer main at Eighth Avenue and West 98th Street. Shorelines get stone-filled gabion bases, coir logs and new planting. eDesign Dynamics designed the system.
The park is a National Historic Landmark and a city landmark, so the dig comes with archaeology. Testing in April 2025 flagged several pipe runs for monitoring, including near the old Kingsbridge Road and Mount St. Vincent.
Why It Matters
The numbers are the argument. The Conservancy and DEP expect the system to save about 175 million gallons of drinking water a year, keep about 132 million gallons out of the combined sewers and cut stormwater flow from that part of the park to the sewers by 90%. Funding includes more than $19.6 million in city capital money, $14.2 million of it from DEP, plus a $10 million Green Resiliency Grant from New York State.
For a $35.7 million job, it touches a lot: hydraulic engineering, pond dredging and historic preservation, in one of the most heavily used public spaces in the country. Conservancy CEO Betsy Smith called it the group’s most ambitious infrastructure project to date.
The bigger point is the model. New York’s combined sewer overflow fight usually means tunnels and tanks costing billions. Using a park’s own lakes as storage won’t replace those, but at 132 million gallons a year it’s cheap capacity, and other cities with historic parks over combined sewers will be watching how it performs.
Related coverage & projects
Project Team & Details
| Developer | Central Park Conservancy |
|---|---|
| Owner / Client | NYC Parks (City of New York) |
| Consultants | eDesign Dynamics (Design) |
| Status | Under Construction |
| Funding Source | Mixed |
Where to find this project
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.
More images from North End Recirculation System, Central Park, New York, New York
Related coverage & projects
Project Team & Details
| Developer | Central Park Conservancy |
|---|---|
| Owner / Client | NYC Parks (City of New York) |
| Consultants | eDesign Dynamics (Design) |
| Status | Under Construction |
| Funding Source | Mixed |