Big Creek Tunnel, Cleveland
A construction project located in Cleveland.
A Bit About Big Creek Tunnel, Cleveland
The Big Creek Tunnel is the last big bore in Cleveland’s Project Clean Lake. The Northeast Ohio Regional Sewer District’s board awarded the $324.8 million contract on Aug. 20, 2026, to Granite-Super JV, a joint venture of Granite Construction and Super Excavators. It was the low bid of four.
When it’s done, the district will have finished all seven of the large-diameter combined sewer overflow storage tunnels it committed to when the program started in 2011.
Project Scope
The main tunnel runs about 22,300 linear feet, a little over four miles, through rock 50 to 100 feet below Cleveland, Linndale and Brooklyn. Finished diameter is 20 feet. The bid documents call for a segmental lining of steel-fiber-reinforced concrete, so crews won’t be placing a conventional rebar cage behind the TBM.
There’s a lot more to the package than the main drive. Add roughly 3,115 feet of ancillary tunnels: an overflow tunnel, a connecting tunnel, a dewatering tunnel and adits. The contract also covers six drop shafts, consolidation sewers, diversion structures, gate and screening structures, gate control vaults and an overflow box culvert. Mechanical, electrical and instrumentation work for the gates is in the contractor’s scope too.
The tunnel will pick up flows from 11 combined sewer outfalls along Big Creek. The district expects it to cut combined sewage releases by about 550 million gallons a year.
Construction was slated to start this fall. Construction Dive puts completion in winter 2030, while Tunneling Online reports work running through 2031.
Why It Matters
Project Clean Lake is a $3 billion, 24-year program written into the district’s consent decree, and its target is a 4.5-billion-gallon annual cut in overflows to Lake Erie and its tributaries. Big Creek is the final storage tunnel in that sequence. After it, the district’s spending tilts toward green infrastructure and plant upgrades instead of deep rock work.
For the tunneling market, the job keeps one of the Midwest’s steadiest owners active a while longer. Super Excavators, based in Menomonee Falls, Wis., brings utility and tunnel experience from Milwaukee-area work, and Granite adds national heavy-civil capacity.
The bid number is worth a look. ConstructConnect listed a pre-bid estimate of about $311.2 million, so the winning price landed roughly 4% above it. That’s a narrow spread for a four-mile rock tunnel in 2026, and it suggests the district’s estimators had a good read on what the contractor pool would charge.
Six shafts across three municipalities means a lot of neighborhood work zones. Expect the shaft sites, not the TBM drive, to be where most of the public friction shows up.
Project Team & Details
| Owner / Client | Northeast Ohio Regional Sewer District |
|---|---|
| General Contractor | Granite-Super JV (Granite Construction and Super Excavators joint venture) |
| Status | Planned |
| Delivery Method | Design-Bid-Build |
| Funding Source | Public (Municipal) |
Where to find this project
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.
More images from Big Creek Tunnel, Cleveland
Project Team & Details
| Owner / Client | Northeast Ohio Regional Sewer District |
|---|---|
| General Contractor | Granite-Super JV (Granite Construction and Super Excavators joint venture) |
| Status | Planned |
| Delivery Method | Design-Bid-Build |
| Funding Source | Public (Municipal) |