Vertical Harvest’s farm in Westbrook, Maine, is a factory that happens to grow lettuce. Wright-Ryan Construction built the 51,000-square-foot vertical farm on a quarter-acre downtown lot, fitting a Dutch growing system into a steel and concrete building designed to U.S. codes, and ENR named it Best Project in the Manufacturing category of its 2026 East Best Projects, published Nov. 5, 2026. It was also a regional Project of the Year finalist.
Project Scope
Harriman was the lead designer, serving as architect and civil, structural and mechanical engineer, with Gyde Architects also credited on design. Haley Ward did laser scanning and BIM coordination. Wright-Ryan ran the job as construction manager at risk, with Warren Mechanical, High Tech Fire Protection, Charles Leonard Steel Services, Metro Walls, 5 Seven Exteriors and Cote Crane & Rigging among the trade partners alongside Dutch suppliers Dool International, PB Tec and Verkade Klimmat.
Inside are stacked hydroponic grow rooms, grow lights, air handlers, baffle walls, conveyors, irrigation skids and a lot of hydronic pipe. The team kept most of that piping at a single elevation with ducts and racking below it, and modeled everything down to hangers and insulation. A paternoster conveyor moves product through the building and you can see it from the street. Owner claims include up to 95% less water than field farming and output equal to roughly 250 acres of farmland, with about 3 million pounds of greens a year at full run. Those are the farm’s numbers, not measured results.
The logistics were the headache. More than 50 overseas containers arrived at a site with almost no laydown space, so Cote staged equipment at its Auburn yard for just-in-time delivery. Some racks had to shift by millimeters to clear columns that were technically in tolerance. Metric and imperial drawings, different code assumptions and a team split across time zones didn’t help.
Why It Matters
The build went fine. Construction started in April 2022 and ran long against an early-2024 target, but ENR’s entry says the job finished in May 2025 on budget and on schedule. Mainebiz put the total project cost at $88 million, including $59.5 million in public-private financing backed by USDA loan programs.
The business has been bumpier. In August 2026 the holder of an $8.66 million C-PACE loan filed to foreclose on the farm’s subleasehold, and the Portland Press Herald reported the case was dismissed in September after Vertical Harvest paid up. A broker lawsuit and a city tax lien preceded it.
That split is worth remembering. Contractors can solve European-to-American fit-up and a jammed downtown site. They can’t fix the unit economics of indoor lettuce.
Project Team & Details
| Owner / Client | Vertical Harvest Farms |
|---|
| Architect | Harriman (lead designer); Gyde Architects |
|---|
| Consultants | Harriman (Civil, Structural and Mechanical Engineering) Haley Ward (BIM, Laser Scanning and Coordination) |
|---|
| General Contractor | Wright-Ryan Construction |
|---|
| Major Subcontractors | Warren Mechanical Inc. (Mechanical) High Tech Fire Protection Inc. (Fire Protection) Charles Leonard Steel Services (Steel) Wright-Ryan FOD Concrete (Concrete) Metro Walls Inc. (Trade Partner) 5 Seven Exteriors (Exteriors) Cote Crane & Rigging (Crane and Rigging) Dool International B.V. (Trade Partner) PB Tec (Trade Partner) Verkade Klimmat (Trade Partner) |
|---|
| Status | Completed |
|---|
| Delivery Method | CMAR |
|---|
| Funding Source | Private |
|---|