The Westin Indianapolis International Airport hotel took 17 years to get out of the ground. Now it’s running early. The Indianapolis Airport Authority showed off the first finished model guest room on Oct. 29, 2026, and the authority says the $205.8 million job is ahead of schedule for a late-2027 opening.
It’s the hotel the Midfield Terminal was always supposed to have. When IAA planned the terminal that opened in 2008, the drawings included a connected hotel, and at least one earlier developer deal fell apart before the authority decided to own the building itself and hire an operator.
Project Scope
The seven-story hotel has 253 guest rooms, roughly 10,000 square feet of meeting space, a full-service restaurant, a fitness center and a seventh-floor bar and lounge looking over the airfield. A pedestrian passage runs through the building to the airport parking garage, and the hotel gets its own parking with valet.
Indianapolis-based CSO produced the construction documents and handled architecture, civil, structural, mechanical, electrical and interior design. Shiel Sexton Company, also from Indianapolis, built the construction program and guaranteed maximum price and is the general contractor. FlickMars did the public-space interiors and Carson Design did the guestrooms. Louderback Group serves as IAA’s owner’s representative, CHMWarnick is the hotel asset manager and Wischermann Partners will operate the property under Marriott’s Westin flag.
Ground broke on June 12, 2025. Crews topped out the frame on May 14, 2026, and enclosure and interior build-out followed. The authority says more than 100 Indiana companies have worked on the job, accounting for more than $150 million of trade and design work, with an average daily crew of about 120.
Why It Matters
The financing is the part other airports will study. IAA paid for the hotel with airport general revenue bonds, Marriott key money and an airport equity contribution, and it says no tax dollars went in. That’s an owner taking on hospitality development risk directly, which many U.S. airports have avoided. IAA’s argument is its balance sheet: reserves up 88% over a decade, $127 million of debt retired, and A to A+ ratings from Fitch, Moody’s and S&P.
The demand case is simple. About a third of IND passengers leave before 9 a.m., and the nearest full-service hotels sit off the airport campus. A terminal-connected Westin captures those early-morning travelers plus the meeting business that doesn’t want a shuttle ride.
The model room is a small milestone. Running ahead of schedule on a building this tied to airport operations isn’t.
Related coverage & projects
Project Team & Details
| Developer | Indianapolis Airport Authority |
|---|
| Owner / Client | Indianapolis Airport Authority |
|---|
| Architect | CSO (Architect of Record; Architecture, Civil, Structural, MEP and Interior Design) |
|---|
| Consultants | Louderback Group (Owner's Representative) CHMWarnick (Hotel Asset Manager) FlickMars (Public Space Interior Design) Carson Design (Guestroom Interior Design) Wischermann Partners (Hotel Operator) |
|---|
| General Contractor | Shiel Sexton Company |
|---|
| Status | Under Construction |
|---|
| Delivery Method | CMAR |
|---|
| Funding Source | Mixed |
|---|