One of downtown Houston’s oldest office towers is becoming a hotel. SLTX Capital is converting the Scanlan Building at 405 Main St. into the Canopy by Hilton Houston Downtown, the brand’s first Houston location, with 140 rooms, a restaurant and bar and a rooftop garden. The developer set a June 4, 2026 start and is aiming to open in 2027.
D.H. Burnham & Co. of Chicago designed the 11-story tower, completed in 1909 for the family of two-time Houston Mayor Thomas Howe Scanlan. It’s believed to be the firm’s only office building in Houston, and its steel frame was unusual for the city at the time. The site once held the “White House” of the Republic of Texas, and the building joined the National Register of Historic Places in 1980. Most passersby know it for the mural of a boy on a bicycle that covers one wall.
Project Scope
SLTX, a Sugar Land hospitality investor led by Ali Momin and Navid Karedia, took the building in December 2024 through a deed in lieu of foreclosure after the previous owners handed it to their lender. County records had appraised it at $7.5 million. Reports put the building at about 96,700 square feet, though earlier coverage used 87,000.
Houston Business Journal reported in May 2026 that the conversion will cost at least $12 million. The scope replaces plumbing, electrical and mechanical systems and the elevators while keeping the facade, the mural, crown molding and marble walls and floors. MEP Green Design & Build handled MEP design. Frontera Hotel Group of Plano will manage the hotel. No architect or general contractor has been named publicly.
Why It Matters
At roughly $86,000 a key, this is a low-cost way to put a branded hotel on Main Street, and the economics lean on three things: state and federal historic tax credits, the building’s opportunity zone location and a structure that’s already standing. That’s why downtown Houston keeps turning small old office stock into rooms.
The risk is the usual one with century-old buildings: what’s behind the plaster. A $12 million floor leaves little cushion for surprises in a 1909 frame that needs modern elevators and life safety systems, and the credits bring Texas Historical Commission and National Park Service review into every design change. If the team opens in 2027, the Scanlan becomes a useful comp for the other narrow historic towers along Main Street that are too tight for apartments but about right for a 140-key hotel.
Related coverage & projects
Project Team & Details
| Developer | SLTX Capital |
|---|
| Owner / Client | SLTX Capital |
|---|
| Consultants | MEP Green Design & Build (MEP Engineering) Frontera Hotel Group (Hotel Operator) |
|---|
| Status | Under Construction |
|---|
| Funding Source | Private |
|---|