Harbor Bridge Project, US 181, Corpus Christi

A construction project located in Corpus Christi.

Cable-stayed main span of the new Harbor Bridge over the Corpus Christi Ship Channel, both pylons and the full cable fan visible

A Bit About Harbor Bridge Project, US 181, Corpus Christi

Where to find this project

Loading...

More images from Harbor Bridge Project, US 181, Corpus Christi

Harbor Bridge Project, US 181, Corpus Christi -
Harbor Bridge Project, US 181, Corpus Christi -

Project Team & Details

Owner / ClientTexas Department of Transportation (TxDOT)
ConsultantsArup (Engineer of Record from 2020, as Arup-CFC)
FIGG Bridge Engineers (original design engineer, replaced in 2020)
General ContractorFlatiron/Dragados LLC (joint venture of Flatiron Construction Corp. and Dragados USA)
Major SubcontractorsMammoet (heavy-lift engineering for removal of the old bridge center span)
StatusCompleted
Delivery MethodDesign-Build
Funding SourcePublic (State)

Leave a Review

Select a rating