Snowy 2.0 Pumped Storage Power Station

A construction project located in Cooma.

Concrete-lined headrace tunnel on the Snowy 2.0 pumped storage project

A Bit About Snowy 2.0 Pumped Storage Power Station

Where to find this project

Loading...

More images from Snowy 2.0 Pumped Storage Power Station

Snowy 2.0 Pumped Storage Power Station -
Snowy 2.0 Pumped Storage Power Station -

Project Team & Details

DeveloperSnowy Hydro Limited
Owner / ClientSnowy Hydro Limited (Australian Commonwealth Government)
General ContractorFuture Generation Joint Venture (Webuild / Clough / The Lane Construction Corporation)
StatusUnder Construction
Delivery MethodDesign-Build
Funding SourcePublic (Federal)

Leave a Review

Select a rating