Kariba Dam Rehabilitation, Zambezi River

A construction project located in Kariba.

Downstream face of the arch dam with the six spillway openings, a crane barge working in the plunge pool and site works on the bank

A Bit About Kariba Dam Rehabilitation, Zambezi River

Where to find this project

Loading...

More images from Kariba Dam Rehabilitation, Zambezi River

Kariba Dam Rehabilitation, Zambezi River -
Kariba Dam Rehabilitation, Zambezi River -

Project Team & Details

Owner / ClientZambezi River Authority
ConsultantsGruner Stucky (Supervising engineer)
General ContractorRazel-Bec (plunge pool); GE Hydro France / Freyssinet International (spillway)
Major SubcontractorsMorris Material Handling / STUB Engineers JV (Spillway gate hoisting systems, Phase 2)
Sinohydro Bureau 8 (Stop logs)
APC Presmet (Needle cofferdam)
StatusUnder Construction
Funding SourceMixed