Tampa Theatre reopened its Duncan Auditorium on Oct. 10, 2026, five days before its 100th birthday, after a seven-month restoration that put the 1926 movie palace back in its original colors. The work is the $13.5 million first phase of a $24.5 million restoration and modernization program. Creative Contractors built it, DLR Group designed it and EverGreene Architectural Arts handled the decorative restoration.
John Eberson designed the atmospheric theater at 711 N. Franklin St., where the auditorium ceiling plays as a night sky over a Mediterranean courtyard. It almost didn’t make it to 50. Facing demolition in the early 1970s, the building was bought by the City of Tampa in 1973 and reopened in 1976. The city still owns it, and a nonprofit runs it.
Project Scope
The auditorium went dark March 10. EverGreene’s crews repaired cracked plaster, recreated decorative finishes by hand and matched paint colors found through forensic analysis. “For the first time since 1926, it’s going to look like it did in 1926,” CEO George Levesque told WUSF.
Creative Contractors’ scope went well past paint. It covered HVAC, electrical and mechanical upgrades, a new stage truss system and theatrical lighting, audiovisual work, refreshed concessions and new restrooms. In the Florida Avenue wing, the second and third floors became education and archive space, about 3,000 square feet for film classes and summer camps, and a new elevator improves access. Outside, the signage got new paint and lighting. The smaller John T. Taylor Screening Room stayed open throughout.
A second phase, targeted for 2028, adds a third public programming space and restores the theater’s Mighty Wurlitzer organ.
Why It Matters
Good historic theater work is mostly invisible. The hard part here was the calendar: a century-old plaster room, a reopening date pinned to a centennial and an operator that couldn’t afford to stay dark for long. The team made the date.
The funding mix is worth copying. Tampa’s Community Redevelopment Agency committed $14 million toward the restoration in 2023, and the theater has raised the rest through its Second Century Campaign. Public redevelopment money, a specialist decorative firm and a local general contractor got a fragile building through a full systems upgrade without sanding off what makes it worth saving.
Plenty of cities have a Rapp & Rapp or Eberson palace running at half speed. Tampa just gave them a schedule and a budget to point to.
Related coverage & projects
Project Team & Details
| Developer | Tampa Theatre (nonprofit operator) |
|---|
| Owner / Client | City of Tampa |
|---|
| Architect | DLR Group |
|---|
| Consultants | EverGreene Architectural Arts (Decorative Restoration) |
|---|
| General Contractor | Creative Contractors |
|---|
| Major Subcontractors | EverGreene Architectural Arts (Plaster and Decorative Finishes) |
|---|
| Status | Completed |
|---|
| Funding Source | Mixed |
|---|