Newark Liberty Terminal A Southern Expansion, New Jersey
A construction project located in Newark.

A Bit About Newark Liberty Terminal A Southern Expansion, New Jersey
The Newark Liberty Terminal A Southern Expansion is a $100 million add-on to a terminal that’s barely three years old. The Port Authority of New York and New Jersey’s board authorized the money on Sept. 24, 2026, along with $10 million to start planning a larger northern expansion. Construction on the southern piece is set to start in 2027 and finish in 2029.
Terminal A opened in January 2023 at a cost of $2.7 billion. It was designed for about 13 million passengers a year. It handled roughly 18 million in 2024, close to 40% above projection.
Project Scope
The southern expansion adds about 25,000 square feet and two common-use gates, with adjacent holdroom seating, men’s, women’s and all-gender restrooms and grab-and-go concessions. That’s a modest program for $100 million, about $4,000 a square foot, but the money covers design and construction on an active airside edge where phasing, security and apron work drive cost.
The northern expansion is the bigger prize. The $10 million buys cost estimates, construction phasing and other early planning for six more common-use gates. The Port Authority expects to bring a project authorization in 2027 and open those gates in phases from 2030 to 2032.
No designer or contractor has been named for either expansion.
Why It Matters
The Port Authority’s own chairman, Kevin O’Toole, said the agency “left room for growth” when it built Terminal A. Good thing. A terminal outgrowing its design capacity within two years is a forecasting miss, even if it’s a happy one, and the fix is eight gates and a lot more money down the line.
The expansions also sit inside a bigger and messier EWR Vision Plan that includes a new Terminal B, a replacement AirTrain and rebuilt roadway and taxiway networks. Common-use gates give the agency flexibility to shift airlines around while those projects move, which may be the real point here.
For builders, the southern job is small, but it’s a likely early look at how the Port Authority procures the northern gates, and those will be a much larger contract.
Project Team & Details
| Owner / Client | Port Authority of New York and New Jersey |
|---|---|
| Status | Planned |
| Funding Source | Public (State) |
Where to find this project
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.
More images from Newark Liberty Terminal A Southern Expansion, New Jersey
Project Team & Details
| Owner / Client | Port Authority of New York and New Jersey |
|---|---|
| Status | Planned |
| Funding Source | Public (State) |