Woodhill Homes Redevelopment, Cleveland
A construction project located in Cleveland.
A Bit About Woodhill Homes Redevelopment, Cleveland
The Woodhill Homes redevelopment in Cleveland built the replacement housing first and knocked down the old housing second. Three apartment phases went up on other sites within about a mile, residents moved, and only then did the 1940 public housing complex come down in 2025. Construction on the original site is the half of the job that’s left.
The third phase, the 64-unit Woodhill Station East, opened in May 2026.
Project Scope
Cuyahoga Metropolitan Housing Authority owns Woodhill Homes, a New Deal-era complex at Woodhill Road and Woodland Avenue on the East Side. Boston-based nonprofit The Community Builders is the developer, working with the housing authority and the City of Cleveland. City Architecture, a Cleveland firm, is the designer, and Marous Brothers Construction was general contractor on the first phase. Sources reviewed for this listing don’t confirm the builder for the later ones.
Phase one, Woodhill Station West, put 120 apartments on a former school site next to the Buckeye-Woodhill rapid transit station. Ninety were set aside for Woodhill households. Phase two, Woodhill Center East, added a 61-unit building and 16 townhouses on Woodland Avenue for $35.2 million. Woodhill Station East, a $34.6 million building with an early childhood center and ground-floor commercial space, sits beside phase one.
Phases four through six return to the cleared site. NEOtrans reported in April 2026 that the planning commission approved schematics for phase four: a 51-unit apartment building with ground-floor retail, 31 townhomes and three parks. Street work to break up the old superblock is already under way. No start date for the buildings has been published.
Why It Matters
Build-first is the humane way to redevelop public housing. It’s also slow and expensive, because the developer has to find and finance off-site land before touching the property it came to fix. Here it took from an October 2021 groundbreaking to mid-2026 to finish three buildings.
The plan was to have all six phases done by 2027. That won’t happen.
The numbers have also moved around. The Community Builders describes about 638 homes. Ideastream’s May 2026 report put the expected total near 700. The original complex is described as 487 units in one account and about 550 in another. What’s consistent is the federal piece: a $35 million Choice Neighborhoods grant in 2021 and a $10 million supplement in 2023, layered with city funds, state housing credits and private financing from firms including Lument and Citizens Bank.
Every new home is within a 15-minute walk of rail, NEOtrans noted, and most are closer. That may be the most durable thing the project does. The old Woodhill was one isolated superblock. The new one is spread across three sites, each near a rapid transit station.
Project Team & Details
| Developer | The Community Builders |
|---|---|
| Owner / Client | Cuyahoga Metropolitan Housing Authority (with the City of Cleveland) |
| Architect | City Architecture |
| General Contractor | Marous Brothers Construction (phase one) |
| Status | Under Construction |
| Funding Source | Mixed |
Where to find this project
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.
More images from Woodhill Homes Redevelopment, Cleveland
Project Team & Details
| Developer | The Community Builders |
|---|---|
| Owner / Client | Cuyahoga Metropolitan Housing Authority (with the City of Cleveland) |
| Architect | City Architecture |
| General Contractor | Marous Brothers Construction (phase one) |
| Status | Under Construction |
| Funding Source | Mixed |