Hewanorra International Airport New Terminal, Vieux Fort, Saint Lucia
A construction project located in Vieux Fort.

A Bit About Hewanorra International Airport New Terminal, Vieux Fort, Saint Lucia
Hewanorra’s new terminal is on its second try. NH International (Caribbean) Ltd. signed a US$243 million contract with the Saint Lucia Air and Sea Ports Authority (SLASPA) on Oct. 20, 2026 to build a three-storey, 274,000-square-foot terminal and the airside works around it at Saint Lucia’s main international gateway in Vieux Fort.
It’s a homecoming for the Trinidad-based contractor. NH built the airport’s existing terminal 32 years ago, according to The Voice St. Lucia. This time it won an open international tender that drew interest from 27 firms, with seven submitting proposals and NH coming out as the best-evaluated bidder on technical and financial scoring.
Project Scope
The contract covers the terminal building plus aprons, drainage, floodlighting and related aviation infrastructure. The new building opens with five contact gates on passenger boarding bridges, adds one more aircraft parking position and leaves room to grow to eight gates. Inside, plans call for larger departure lounges, bigger immigration and customs halls, a new baggage handling system, restaurants, duty-free and premium lounges.
The programme runs 39 months, with completion targeted for late 2029. All of it happens next to a working airport, so phasing and airside safety will drive the schedule as much as the structure will.
This is officially the completion phase of the Hewanorra International Airport Redevelopment Project (HIARP). SLASPA’s 2025 request for proposals described the terminal build-out as the final phase of a programme that first broke ground in 2019. That earlier round was a US$175 million package with a 337,000-square-foot terminal, built by Taiwan’s Overseas Engineering and Construction Co., with Miami-based CBRE | Heery handling project management, engineering and oversight. It was supposed to finish in 2021. It didn’t, and the terminal shrank by more than 60,000 square feet on the way to this contract.
Why It Matters
Tourism drives about 65% of Saint Lucia’s economy, per the Saint Lucia Tourism Authority, and the U.S. is the island’s biggest source market. Hewanorra handles the long-haul jets that bring most of those visitors, and officials said back in 2019 that the existing terminal had exhausted its capacity.
The award also matters for Caribbean contractors. A regional firm beating international bidders for a quarter-billion-dollar airport job isn’t common, and the Trinidad Guardian has already framed it as an opening for Trinidad and Tobago suppliers. If NH can hold a 39-month schedule on a site that’s stalled once already, it’ll be a strong reference for the next round of Eastern Caribbean airport work.
Project Team & Details
| Owner / Client | Saint Lucia Air and Sea Ports Authority (SLASPA) |
|---|---|
| General Contractor | NH International (Caribbean) Limited |
| Status | Planned |
| Funding Source | Public (Federal) |
Where to find this project
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.
More images from Hewanorra International Airport New Terminal, Vieux Fort, Saint Lucia
Project Team & Details
| Owner / Client | Saint Lucia Air and Sea Ports Authority (SLASPA) |
|---|---|
| General Contractor | NH International (Caribbean) Limited |
| Status | Planned |
| Funding Source | Public (Federal) |